VA SAN DIEGO

A VA office needed to design interview and hearing rooms for a new public contact facility. The rooms are required to have an STC of 50 or greater.

The architectectural drawings were reviewed to determine the demising wall assembly constructions. The assemblies were modeled in software to determine their STC. The results were provided with recommendations to meet the 50 STC requirement.